Need for Fire Surveillance and
Predictive Maintenance System
Based on statistics from 2011 to 2023, electrical factors consistently 
account for 23-25% of fire incidents. With approximately
10,000 electrical fires, predicting the extent of property 
damage from a single fire is challenging.
To prevent irreversible damage to facilities such as logistics
warehouses caused by electrical fires, it is essential to implement
a system that reduces fire prevention and occurrence rates and 
an early suppression system
for unavoidable fires.
2022 Comprehensive Fire Statistics
[Ignition Factors - Total] Property Damage Comparison: 1.2104 trillion KRW
01.jpg
2023 Comprehensive Fire Statistics
[Ignition Factors - Total] Property Damage Comparison: 953.6 trillion KRW
02.jpg
Unidentified Electrical Fire Casualties Surge in 4 Years (Data Submitted by KESCO
※ Source: National Fire Agency 2022-2023 Statistical Data
Fire Safety Issues and Solutions
Extracts from News and Articles
02-01.jpg
The answer to rapid detection lies in customized fire detectors that consider reliability and adaptability, while proper response and prevention are found in disaster response integration platforms.
02-02.jpg
Installing fire detectors equipped with IoT functionality is essential. IoT fire detectors enable remote monitoring, allowing for swift initial response.
02-03.jpg
Our country has also revised the fire safety standards (NFSC) for MCC panels.
02-04.jpg
Concerns have been raised about whether temperature-sensitive materials in fire extinguishing devices will activate promptly if a small blaze begins at the base of a panel. This issue is especially pertinent in distribution and control panels, where the intricate design may prevent flames from directly
02-05.jpg
The ideal solution for safeguarding facilities against electrical fires is  the “Quick Tube Smart IoT System.”
Announcement of the 2nd Basic Fire Safety Plan
  2022~2026  
Need for a Smart Fire Monitoring Predictive
Maintenance System
Three Key Development Initiatives for a Safer Nation from Fires:
03-01.png
Future Capabilities
Develop and support fire prevention policies and technologies inspired by future advancements, including thosefrom the Fourth Industrial Revolution.
Leverage scientific innovations like information and communication technology (ICT) and big data to anticipate and prepare for fire incidents.
03-02.png
Future Capabilities
Implement a systematic certificationprocess for fire prevention professionals and enhance their skills through comprehensive education and training programs.
03-03.png
Sustainability
Reinforce the evaluation and feedback mechanisms to ensure the ongoing effectiveness of fire prevention policies
Emphasize critical and urgent performance metrics within the fire prevention policy domain and oversee policy results through consistent assessments. 
Three Key Development Initiatives for a Safer Nation from Fires:
스크린샷 2024-12-03 오전 10.59.23.png
Quick Zero System
03-05.png
03-06.png
03-07.png
03-08.png
Tailored Optimal Solution for the 2nd Basic Fire Safety Policy Plan
Quick Zero System
Synergy of Predictive Maintenance and Fire Extinguishing Functions
Ensures safety and prevents fire escalation through fire prediction maintenance and extinguishing system control, suitable for the direction of the basic fire safety policy plan The only system that combines predictive maintenance and fire extinguishing functions, saving human resources and time equired for maintenance.
04-01.png
Primary Applications
Power plants, logistics warehouses, ESS, smart factories, electrical panels in automated equipment, and any facilities with electrical fire risk
Detection and Response Process
04-02.png
Real-time situation reporting
  • Continuous fire detection with predictive capabilities
  • Rapid follow-up actions enabled by fire alarm notifications
  • Monitoring for malfunctions and usage of extinguishing tubes
  • Regular status updates sent via text messages to designated recipients
  • Early fire suppression to prevent the spread of large-scale fires
Quick Zero System
Configuration Options
05-01.png
Specifications Table
05-02.png
05-03.png
To ensure optimal performance, the maximum tube length is limited to 7.5M. A separate installation is necessary if the required volume exceeds 7.5m in length.
Special orders and modifications are available: Tube color, label, and length (bulk orders subject to negotiation).
Certificates & Awards
06-01.png
Innovation and Pubilc Institution Certificates
06-02.png
Patents & Test Report
Patent
07-01.png
Certificates
07-02.png
Test Reports
07-03.png
Application
Samsung Group
Installation standards for small and medium-sized logistics
automation fire suppression device monitoring systems at Samsung
08-01.png
Application Cases
08-02.png
Other application cases
Public Institution
✔︎ Korea Midland Power (Incheon Power Plant): Solar Unit #2 ESS Battery Module - QUICK ZERO SYSTEM
✔︎ Korea Midland Power (Incheon Power Plant): Solar Unit #3 ESS Battery Module - QUICK ZERO SYSTEM
✔︎ Korea Midland Power (Shin Boryeong Power Plant): Shin Boryeong Solar Junction Box - QUICK ZERO TUBE
✔︎ Korea South-East Power (Yeongheung Power Plant): Control Panel - QUICK ZERO SYSTEM
✔︎ Korea South-East Power (Yeongheung Power Plant): Cable Tray - QUICK ZERO SYSTEM
✔︎ Korea South-East Power (Yeongheung Power Plant): Fly Ash Processing Electrical Room - QUICK ZERO SYSTEM
✔︎ Korea Midland Power (Seoul Power Plant): Underground Power Plant HVAC Control Panel - QUICK ZERO SYSTEM
✔︎ Korea Midland Power (Seoul Power Plant): Seoul Power Plant Fuel Cell Power Panel - QUICK ZERO SYSTEM
✔︎ Korea Midland Power (Seoul Thermal Power): QUICK ZERO SYSTEM
✔︎ Korea Western Power (Gunsan Power Plant): Goheung Solar Junction Box & Inverter Panel - QUICK ZERO TUBE
✔︎ Korea Western Power (Taean Power Plant): Electrical Department & IGCC Panel - QUICK ZERO TUBE
✔︎ Korea Western Power (Gunsan Power Plant): Hwasun Wind Power - QUICK ZERO SYSTEM
✔︎ Korea East-West Power (Dangjin Thermal Power Plant): QUICK ZERO TUBE
✔︎ Korea Southern Power (Samcheok Bitdream Power Plant) : Limestone Handling System Electrical Room - QUICK ZERO TUBE
✔︎ KEPCO KPS (Busan Office): Inverter Panel - QUICK ZERO SYSTEM
✔︎ KEPCO KPS (Busan Office): Rooftop Solar Inverter Panel - QUICK ZERO TUBE
✔︎ KEPCO Uiwang Branch: Substation Panel at Materials Inspection Office - QUICK ZERO TUBE
✔︎ Korea Hydro & Nuclear Power: Transformer Panel - QUICK ZERO SYSTEM
✔︎ Dongducheon Dream Power: Underground Power Supply - QUICK ZERO SYSTEM
✔︎ Seoul Metro: Battery Panel - QUICK ZERO SYSTEM
✔︎ Changnyeong County Construction and Industry Bureau (Waterworks Department)
✔︎ : Main Panel at Water Supply Reservoir - QUICK ZERO TUBE
Private Enterprise
✔︎ Samsung Display: Main Panel - QUICK ZERO SYSTEM
✔︎ Samsung Electronics: Samsung Electronics Cheonan - QUICK ZERO SYSTEM
✔︎ Hyundai Green Power: Control Panel - QUICK ZERO TUBE
✔︎ Hyundai Kefico: Vietnam Plant - QUICK ZERO TUBE
✔︎ Hyundai Steel: Panel - QUICK ZERO TUBE
✔︎ YNC Co., Ltd.: Control Panel - QUICK ZERO TUBE
✔︎ LEDLITEK: Control Panel - QUICK ZERO TUBE
✔︎ Hankook Tire: Panel - QUICK ZERO TUBE
✔︎ LG Chem: Panel - QUICK ZERO TUBE
✔︎ Iljin Global: Panel - QUICK ZERO TUBE
✔︎ POSCO: Panel - QUICK ZERO TUBE
✔︎ PROSCOM: Panel - QUICK ZERO SYSTEM